Hoardings · Mumbai

Hoarding Fabrication
in Mumbai

Hoarding structures, construction-site barricades and building wraps fabricated in the workshop and bolted on site, as BMC’s 2025 policy requires. Mumbai hoardings now come with listed sizes up to 40 x 40 ft, 70 m spacing, lights off at 11 pm, a two-yearly structural stability certificate and ₹5 lakh to ₹1 crore of insurance per structure.

40 x 40 ftLargest listed ground size
70 mMinimum spacing
2 yrsLicence and stability renewal
Large blank billboard structure beside a highway with trees and buildings behind

What does BMC require for a hoarding in Mumbai?

A permitted size, a permitted site and a certified structure. BMC’s 2025 policy lists ground sizes up to 40 x 40 ft, bans new rooftop hoardings, requires 70 m spacing, a 12 ft clear height and lights off at 11 pm, and ties every licence to a two-yearly structural stability certificate, audits of older structures and insurance. IBS fabricates to those rules.

What is a structural stability report for a hoarding?

A certificate from a BMC-registered structural engineer that the hoarding structure and foundation are safe. BMC’s 2025 policy requires one for every hoarding at each two-year renewal, with an audit for structures more than ten years old and a foundation certificate every ten years.

What is a dead-wall hoarding?

A hoarding fixed to a blank side wall of a building rather than standing on its own structure. BMC allows them only on buildings under 30 years old, up to 40 x 40 ft and no larger than the wall, within 3 ft of it, and never as a digital screen.

BMC rules

BMC’s 2025 hoarding rules, in one place

Read on BMC’s Policy Guidelines for Display of Outdoor Advertisements 2025 on 28 September 2026. The policy does not refer to any specific incident; these are simply its current requirements.

Sizes and siting

  • Ground hoardings in listed sizes from 10 x 10 ft up to 40 x 40 ft (clause 4.2(i)(b))
  • Near petrol pumps, high-tension lines, traffic signals and toll plazas: 20 x 20 ft, at most 30 x 20 ft
  • No new hoardings on terraces or rooftops
  • Dead walls: buildings under 30 years old, up to 40 x 40 ft, board within 3 ft of the wall, no digital
  • At least 70 m between hoardings, except back-to-back, V, L or multi-sided boards

Height and lighting

  • Bottom edge at least 3.6 m (12 ft) above ground; top edge at most 100 ft
  • None within 50 m of statues or 25 m of a traffic signal stop line
  • Illumination off at 11 pm on an automatic timer
  • Digital hoardings on the ground only, with a Traffic Branch NOC, no flicker, and automatic brightness control to IRC:SP:85-2011

Structure and safety

  • Structural stability report from a BMC-registered engineer, renewed every two years
  • Audit for structures more than ten years old; foundation certificate every ten years
  • Designed for 44 m/s wind (IS 875 Part 3), with perforated sheets and 50% of panels removable to cut wind load
  • Welding in the workshop, bolting only on site; maximum structure life 50 years
  • Insurance of ₹5 lakh to ₹1 crore per hoarding, valid for two years

Fees

  • Licence fees follow BMC’s advertisement schedule; the 2025 policy publishes no rate table
  • Fees to rise 10% every year, subject to Corporation approval
  • Unpermitted structures are an offence under the BMC Act, 1888
  • Two-year licence renewal, tied to a fresh stability certificate
Tall billboard structures beside a busy road at dusk, with traffic below

Fabrication

How IBS builds a hoarding for Mumbai

The rules above are mostly structural, so they are decided in the workshop, long before the structure reaches site.

Structure

  • Steel sections and base plates designed for 44 m/s wind by a registered engineer
  • All welding done in the workshop; members bolted together on site
  • Galvanised or powder-coated steel against coastal corrosion
  • Perforated sheet and removable panels so wind load can be shed in a storm

Face and print

  • Flex faces of 100 micron or more, as the plastic waste rules require
  • UV-stable inks for coastal sun; tensioned faces that do not flap
  • Lighting on an automatic timer set to switch off at 11 pm
  • Site barricades and building wraps printed from the same pipeline

Site barricades and building wraps

  • Barricade panels on galvanised frames, printed in 3M or Avery Dennison media or 100 micron-plus flex
  • Wraps on scaffolding perforated and tensioned so they do not act as a sail in monsoon wind
  • Panels sized to the site survey and numbered for re-erection after works move
  • Artwork updates reprinted and swapped panel by panel, without re-erecting the frame

Specifying for Mumbai conditions

  • Fixings and frames designed for the 44 m/s basic wind speed IS 875 (Part 3) sets for Mumbai
  • LED modules and drivers rated IP65 outdoors, with drainage in lightbox bases for monsoon rain
  • Powder-coated or galvanised frames and stainless fixings against coastal corrosion, which BMC’s own policy flags
  • Outdoor installation planned around the monsoon, which normally runs 11 June to 8 October
  • Marathi first on name boards, no smaller than any other script (Maharashtra Shops and Establishments Act, section 36A)

What IBS’s Mumbai base changes for you

  • Fabrication at the IBS facility in Mumbai, furniture and joinery at the factory near Vasai East; head office in Goregaon West
  • Site survey, fabrication and installation by the same team, without a courier leg
  • Service calls in the Mumbai-Pune corridor typically answered within 24 to 48 hours
  • Permits and licences are yours to obtain; IBS can help with liaison and application drawings, charged separately
  • A line-item BOQ within five to seven working days of the brief
Construction site barricade printed with a navy brand panel along a city street

Commercials

How a Mumbai signage job is priced, specified and verified

The parts of a quotation that decide whether the number you compare is the number you pay, and the component options behind it.

How the price is built

  • A line-item BOQ against the drawing, not a single rate per square foot
  • BMC licence fees shown separately, because they are paid to BMC, not to IBS
  • Structural engineer’s report priced as its own line where the board is over 300 sq ft
  • Night work, scaffolding and access equipment listed, not hidden in a rate
  • Written assumptions, so you can see which one moved if the number changes

Component options we offer

  • Materials are your choice: IBS sets out options against your budget and you decide
  • LED and drivers: Nichia-class modules with Mean Well or Schneider drivers, IP65 outdoors
  • Films and vinyl: 3M and Avery Dennison cast media for outdoor graphics
  • Electrical: Havells, Legrand and Schneider switchgear with MCB and RCCB protection
  • Faces in acrylic or printed flex over aluminium composite panel or powder-coated frames
  • Stainless or galvanised fixings sized for the 44 m/s wind load

What to check in any Mumbai quotation

  • Is the driver brand named? It is the component that fails first in humid air
  • Is BMC liaison, if you want it, quoted as its own line?
  • Is monsoon sealing (drainage, gasketed faces, sealed terminations) specified?
  • Is the warranty stated in months, and who answers a service call in the city?

Quality

How quality is checked before and after installation

Most signage faults in Mumbai trace back to something that could have been caught in the workshop.

Before it leaves the workshop

  • Every lit board tested lit at the IBS facility before dispatch
  • Colour proofed against one approved physical swatch
  • Joints, gaskets and drainage checked on each box
  • Earthing verified to IS 3043; electrical work to IS 732

At handover

  • As-installed photographs, day and night for lit signs
  • Electrical test records and warranty certificate in one file
  • Signage workmanship warranted 12 to 24 months depending on the product
  • A named IBS contact holding the drawings and spares

Planning a hoarding in Mumbai?

Send the site location, the size you want and whether it will be lit or digital. You get a check against BMC’s 2025 rules, a structural design route and a BOQ.

Scope a hoarding

Hoarding types BMC allows, and their limits

Summarised from BMC’s 2025 policy, chapter 4.

Hoarding types BMC allows, and their limits
Where allowedSize limitDigital?
Ground hoardingOn the ground, with spacing and clearance rulesListed sizes up to 40 x 40 ft; smaller near petrol pumps and signalsYes, with Traffic Branch NOC
Rooftop or terraceNo new hoardingsNot applicableNo
Dead wallBuildings under 30 years oldUp to 40 x 40 ft, within the wall, 3 ft off itNo
Converted to digitalExisting ground hoardings, with approvalAs permittedYes, with stability report and landowner NOC

Market Context

What the published data says

Questions Buyers Ask

Frequently asked questions

What are the hoarding rates in Mumbai?
There are two different costs. Media rates, the rent to display on an existing hoarding, are set by the hoarding owner and vary by site. The BMC licence fee follows BMC’s advertisement schedule, which the 2025 policy does not publish and says will rise 10% a year once approved. IBS quotes the structure and print, not media rent.
Is hoarding illegal in Mumbai?
No. Hoardings are legal with a BMC licence and within the 2025 policy’s rules on size, siting, spacing and structure. An illegal hoarding is one displayed without permission or outside those rules, which is an offence under the BMC Act, 1888, and can be removed.
What sizes of hoarding are allowed in Mumbai?
BMC’s 2025 policy lists ground hoarding sizes from 10 x 10 ft up to 40 x 40 ft, including 20 x 20, 20 x 40, 30 x 30 and 40 x 30 ft. Near petrol pumps, high-tension lines, traffic signals and toll plazas the limit drops to 20 x 20 ft, or 30 x 20 ft at most.
Can hoardings go on rooftops in Mumbai?
Not new ones. BMC’s 2025 policy allows no new hoardings on terraces or rooftops. Dead-wall hoardings are still possible on buildings under 30 years old, up to 40 x 40 ft and within the wall, but never as a digital screen.
How far apart must hoardings be in Mumbai?
At least 70 m, measured from the outer edge, under BMC’s 2025 policy. Back-to-back, V-shaped, L-shaped and multi-sided boards on one structure are exempt from that spacing. New hoardings also cannot stand within 50 m of a statue or 25 m of a traffic signal stop line.
How high must a hoarding be in Mumbai?
The bottom edge must be at least 3.6 m (12 ft) above ground, and the top edge no more than 100 ft, under BMC’s 2025 policy. The clear height keeps the structure above pedestrians and traffic, and the cap limits wind load on tall structures.
What structural certificates does a Mumbai hoarding need?
A structural stability report from a BMC-registered engineer at each two-year renewal, an audit for structures over ten years old, and a foundation certificate every ten years. On older buildings, certification must be verified by IIT, VJTI or SPCE. The policy caps a structure’s life at 50 years.
Does a Mumbai hoarding need insurance?
Yes. BMC’s 2025 policy requires insurance of ₹5 lakh to ₹1 crore per hoarding, valid for two years, in line with the two-year licence renewal. The amount depends on the size and category of the structure.
What wind speed must a hoarding in Mumbai withstand?
BMC’s 2025 policy states that structures in the Mumbai region must withstand 44 m/s (158.4 km/h), the basic wind speed IS 875 (Part 3) sets for Mumbai. New hoardings must use perforated sheets and have half their panels removable so wind load can be shed in a cyclone.
Are digital hoardings allowed in Mumbai?
Yes, on the ground only, with a Traffic Branch (Mumbai Police) NOC. They must not flicker, must switch off at 11 pm, and must adjust brightness automatically with a light sensor to IRC:SP:85-2011 limits. Existing ground hoardings can be converted with approval, a stability report and the landowner’s NOC.
When must hoarding lights be switched off in Mumbai?
At 11 pm, on an automatic timer, under BMC’s 2025 policy. That applies to lit and digital hoardings alike, so IBS fits a timer as part of the electrical scope rather than relying on someone to switch the lights off.
Can flex be used for hoarding faces in Mumbai?
Yes, if it is at least 100 micron thick. The Plastic Waste Management (Amendment) Rules, 2021 ban plastic or PVC banners thinner than 100 micron from 1 July 2022, and Maharashtra’s own plastic notification does not name banners. Standard hoarding flex is well above that; IBS states the gauge on the BOQ.
Does IBS make construction-site barricades and building wraps in Mumbai?
Yes. Site barricades and building wraps are printed and fabricated through the same workshop, sized to the site and fixed so they survive monsoon wind. Wraps on scaffolding are tensioned and perforated so they do not act as a sail.
Why is welding not allowed on site for Mumbai hoardings?
BMC’s 2025 policy requires welding to be done in the workshop and only bolting on site. Workshop welds can be inspected and protected against corrosion properly, while site welds on a tall structure are hard to check and to coat, which matters in Mumbai’s humid, salty air.
What does IBS need to quote a hoarding in Mumbai?
The site location and plot details, the size you want from BMC’s listed sizes, whether it will be lit, digital or unlit, and the ground or wall conditions if known. From that IBS checks the site against the 2025 rules on spacing, clearance and nearby signals or petrol pumps, then prices the structure, foundation, face and electrical scope line by line.
How does the monsoon affect hoarding work in Mumbai?
Foundations and erection are best done outside the monsoon, which IMD dates normally run from 11 June to 8 October in Mumbai. Structures are designed for the 44 m/s wind speed in any case, but concrete curing, crane work and electrical terminations need dry windows, so IBS plans the programme around the forecast.
How does IBS handle a hoarding project in Mumbai?
Site and size are checked against the policy first, then a registered engineer designs the structure for 44 m/s wind. Members are fabricated and welded in the workshop, galvanised or coated, bolted together on site, and handed over with the stability certificate, timer and as-built photographs.